We are so thankful for the progress on our building restoration and renovation. Some may have been following the process all along, but in case you missed all that has been happening, here you go:
Mid-October – The building we have now purchased flooded in the 100-year rains that hit our whole community. With water reaching 1-2 inches at most.
4-5 Days later – We vacuumed out all the water and then teams from our church removed all the current carpet.
Beginning of Nov – We conducted an environmental study. Per that report, we have repaired issues with the roof and contracted to have the bottom section of sheetrock replaced around the entire building and insulation treated, as a precautionary measure.
All walls are currently being painted in a new color scheme.
And in a few days, the workers will install highly functional carpet square flooring throughout the entire worship space, and all perimeter rooms will receive durable plank flooring.
In the process, we also removed the basketball rims and expanded our previous Room 3/4 into a large fellowship/classroom space.
Stay tuned for info on the BIG DAY! When we move back in, and ways you can help with that process.